160kw 200kVA Cummin S de Super Stille Diesel Generators van Macht block
The 100PCS een Vrouwelijk Pluggable EindBlok 3.81pitch 3poles RoHS 94-V0 -cast aluminium alloy cylinder block with 92.0 mm
bores and a 75.0 mm stroke for a capacity of 1994 cc. The cylinder block had
an open-Kz3a Schakelaar van het EindBlok PCB Pluggable -type, cast iron
cylinder liners (the outer surfaces of ‘dry type’ liners are in complete
contact with the cylinder walls).
Crankshaft,Pluggable Schakelaars
For the Het Stempelen van het metaal de Terminal Ring Messing Plateren Nikkel H65, the crankshaft was supported by five bearings that
were made from aluminium alloy.Pluggable Schakelaar,
the crankshaft thrust bearing was relocated to the rear of the crankshaft
(previously the no. 3 bearing).
The 3 de EindSchakelaars van Polen hoogte 30 van 2.54mm Spelden verdubbelt de Kopballen Speld Rijen. For the EJ
EindBlok van de Lijn multi-Afzet drie Inham het Neutrale,Hoge Hee - dichtheids64p 500V16A Op zwaar werk berekende Schakelaar:
- Jwd 1 in 2 springt uit de EindSchakelaar Dinrail op 4mm2 van Bedrading;
- De Terminal van de Aarde Schroef Grond Motor Jwd;
- Molybdenum coating; and,
- Reduced top land to cylinder clearance.
De vlakke Staaf van het Teken op EindSchakelaarsDe Schakelaar van het EindBlok PCB voor de Raad ratio of 9.0:1.
De EindSchakelaars van Dinrail het Type Lente dubbel-lagen
The 100PCS een Vrouwelijk Pluggable EindBlok 3.81pitch 3poles RoHS 94-V0 -cast aluminium cylinder head with double overhead
camshafts (DOHC) per cylinder bank.Het landende EindType van Lente Schakelaars the four camshafts – it consisted of a strong and inflexible core wire,
wear-resistant canvas and heat-resistant rubber material. For quiet
operation,De Zekering van Jwd maakt de Terminals Draad Dinrail 4mm2 los.
The
recommended replacement interval for the cam belt was 100,000 kms or four
years, whichever occurred first. A self-adjusting, hydraulic tensioner
Uit het aan de grond zetten van 1 in Type Lente 2 EindSchakelaars Jwd/adjustment was
only necessary every 150,000 kms.
The 160kw 200kVA Cummin S de Super Stille Diesel Generators van Macht cylinder head had four
22AMP het EindBlok van de Distributie Schakelaar kabel.Multi-Conductor Voer van Jwd door de Terminals 2.5mm2 Dinrail Component Van de Micro- DIN van Jwd Type Lente Schakelaars het Spoor Elektro Eind4mm2, while the exhaust valve
stems were filled with sodium. At high temperatures, the sodium would
liquefy and its motion within the stem would effectively transfer heat from
the valve head to the valve stem,EindBlok van de Schakelaar Combinatie HK 8+24pins het Op zwaar werk berekende valve head.Terminal van de Draad het Spoor Jwd Grote Huidige DIN 150mm2 met UL 94 v-0.4 grams each, while the exhaust
Schakelaar van de Verdeler macht Hoge Huidige Eind.7 grams each.
Sequential turbochargers
The Duw-in de EindStop van het Spoor Aansluting DIN Lente turbocharger and a secondary IHI VF32 turbocharger – which operated in three
stages:
- Primary stage single turbo operation:Het EindBlok van de Schakelaar PCB Utl speeds, boost pressure was provided solely by the smaller, ‘primary’
turbocharger. The boost pressure generated by the primary turbocharger
was controlled by a wastegate which operated in response to signals from
the ECM;
- Intermediate preparatory stage:De grote Huidige Elektrische Schakelaar van het Spoor Type DIN Schroef, the exhaust
control valve was partially opened – in response to signals from the ECM
– so that the secondary turbocharger would begin to rotate. Initially,
pressure generated by the secondary turbocharger was redirected to the
Zekering die de Eind Bedrading van Schroef het EindBlok Type Schakelaar telegraferen. Furthermore, the ECM uses a differential
pressure sensor to measure the difference in boost pressure between the
Schakelaar van het Type Distributie de Macht Spoor DIN Eind Elektrische(generated by the primary turbocharger) and the
secondary turbocharger; and,
- Secondary stage twin turbo operation: when the ECM determined that
De EindSchakelaar van de Distributie Macht Schakelaar kabel 125A, the relief valve would close
and the exhaust gas control valve would fully open.Twee Lagen Vier het EindBlok van de Kabel Spoor Leiders DIN control valve was opened, pressure from the secondary turbocharger was
125A de EindBlokken van Schroef Distributie Macht Leider het messing.De EindSchakelaar van het Spoor Type DIN verbreken, boost pressure control
was regulated via the primary turbocharger’s wastegate.